S6 construction site bridge

To facilitate the work of construction vehicles on the construction site of the new S6 expressway near Słupsk, the general contractor (NDI S.A.) decided to use a professional temporary bridge over the Łupawa River. A thorough analysis of the situation indicated the JSB1 bridge as the most suitable solution - it was fully assembled in the Janson Bridging workshops and installed on site by NDI S.A. within a few hours.

Partager sur :

Détails du projet

Solution
Pont à poutres à âme pleine
Type
JSB
Longueur
24m
Poids
3,5m
Capacité
Eurocode LM1
Pont à poutres à âme pleine