Pedestrian bridge 106x3m Nieuwegein

In 2016, the combination 'Sas van Vreeswijk BV' was awarded the contract for the design, construction, maintenance and financing of a third lock and widening of the Lekkanaal.

For this purpose, a ramp was needed to divert light traffic on site. A temporary bicycle bridge was chosen over the new lock bell to be constructed, from the lock to the Kazernedok, a local road.

Janson Bridging constructed a bicycle bridge from stock with a total length of 106 metres, consisting of three partial spans of 39, 33 and 33 metres.

Partager sur :

Détails du projet

Solution
Pont piétonnier
Type
JPB-P
Largeur totale
106 m (35 bays)
Largeur de surface de roulemen
3 m
Poids propre
105 ton
Charge de conception
5 kN/m²
Date d'installation
September 2016
Période de location
10 months
Temps d'installation
3 days
Pont piétonnier