Flyover bridge in Poznań
Due to the insufficient load-bearing capacity of the existing permanent crossing, we delivered a temporary bridge which, when installed directly above the existing bridge, will enable the passage of heavy equipment (100% Eurocode LM1).
Détails du projet
Solution
Pont à poutres
Type
JSK-JBB
Longueur
13,5m
Poids
3,6m
Charge
Eurocode LM1