JSB bridge in Szczawa

For the duration of the reconstruction of the bridge over the Kamienica stream along DW968 in Szczawa in Lesser Poland, we made available and installed, in cooperation with the client - Nowak Mosty - a single-span temporary JSB bridge with a length of 40.5 m and a deck width of 5 m. The bridge is intended to handle class B vehicle traffic and pedestrian traffic on a sidewalk separated from the deck.

Partager sur :

Détails du projet

Solution
Pont à poutres à âme pleine
Type
JSB
Longueur
40,5m
Poids
3,5m+1,5m
Poids
109t.
Capacité
kl.B
Pont à poutres à âme pleine