Kristiansand access bridge

In order to enable the construction of a pipeline tunnel, but also to ensure the accessibility of several offices, a temporary bridge over the sheet pile wall pit was necessary. Our customer TT Anlegg chose the bridge system JSB-2 because this system could be installed quickly and because this bridge only needs to be put into use for 6 months.

The installation date was planned for April 26, 2022 and went without any problems in close cooperation with the customer.

Partager sur :

Détails du projet

Solution
Pont à poutres à âme pleine
Type
JSB
Largeur totale
27 m
Longueur de section
13,5 m
Largeur de la route
5 m
Hauteur de tablier support incl.
1,1 m
Couche d'usure
Anti skid 2/3 mm
Poids propre
69 tons
Charge de conception
Loadcase 4-6, Bk 10/60 boggilast
Client
TT Anlegg
Pont à poutres à âme pleine