Bridge for transport of wind turbines
Our client Implenia Norge AS needed a temporary bridge for the transport of wind turbines into a local area, project Fløytdammen. They need to transport, hoist and assemble towers, turbines and transformers.
Janson Bridging has provided a temporary bridge to get the transports across a dam in a rural area near Bruvoll, Norway.
The bridge elements left Hank, the Netherlands on monday June 22 and arrived on site on time at Wednesday morning June 24.
A 200 ton crane was needed to unload and install the elements due to the limited access and working space.
Project details
Solution
Girder Bridge
Type
JSK
Total bridge length
15,7 mtr
Road width
4,2 mtr
Height
0,45 mtr
Weight
38 Tons
Type of traffic
Construction Traffic