Flyover bridge in Sierakowice
In order to secure the existing bridge in the town of Sierakowice during the transportation of oversized loads destined for the power plant in Rybnik, a temporary bridge JSK450, 13.5m long, was used as a 'Flyover' type bridge, that is, a bridge over the existing bridge. Installed and dismantled several times in the same place for the duration of subsequent night crossings, it allowed for the safe passage of loads weighing several hundred tons.
Project details
Solution
Beam Bridge
Type
JSK-JBB
Length
13,5m + ramps
Width
6m
Capacity
Super Heavy transports