Temporary Ro-Ro platform

To support the transport of tanks weighing 400 tons each from Gdynia to Szczecin, our client decided to use a temporary bridge of the JSK system as a Ro-Ro platform. In this way, the time of the entire operation was reduced to a minimum and part of the quay was protected against damage.

Share on:

Project details

Solution
Beam Bridge
Type
JSK-JBB
Length
35m
Width
11,4m
Beam Bridge