Flyover bridge in Poznań
Due to the insufficient load-bearing capacity of the existing permanent crossing, we delivered a temporary bridge which, when installed directly above the existing bridge, will enable the passage of heavy equipment (100% Eurocode LM1).
Projectdetails
Oplossing
                Balkbrug
            Type
                JSK-JBB
            Lengte
                13,5m
            Breedte
                3,6m
            Belasting
                Eurocode LM1
            
                                                    Uitgelicht
                        
            Project
                                
                                    In order to demolish old buildings at the water treatment plant in Będzin, the client's heavy equipment needed to pass the Pogoria stream. The paramet...
                
                                    
                
            
                        
            Oplossing
                                Balkbrug (JSK-JBB)
Jansons balkbruggen (JSK) zijn ontworpen voor een relatief korte vrije overspanning tot maximaal 21 meter. De balkbrug wordt vaak ingezet als tijdelij...