Eurocode LM1 temporary bridge in Żabno, Poland

After initial assembly of the 30m sections in our workshops in Hank, the Netherlands, they were transported and installed in Żabno in the Podkarpackie province. The entire operation of placing the prepared bridge sections on previously prepared abutments took less than 2 hours and involved minimal traffic disruptions. The JSB1 single-span temporary bridge with dimensions of 30 m in length and 7 m in usable width will handle class II traffic (100% Eurocode LM1) until the renovated crossing along DW856 is put back into operation.

Deel op:

Projectdetails

Oplossing
Plaatliggerbrug
Type
JSB
Lengte
30m
Breedte
7m
Belasting
100% Eurocode LM1 / kl.II
Plaatliggerbrug

Uitgelicht

Project

During the reconstruction of the bridge over the Poroniec stream in Poronin, drivers and pedestrians can use the JSB2 modular temporary bridge. To min...
Plaatliggerbrug (JSB)
Oplossing

Plaatliggerbrug (JSB)

Jansons plaatliggerbruggen (JSB) zijn ontworpen voor tijdelijke toepassingen, met name in gebieden met een hoge verkeersintensiteit en waar een vrije...