JFB bridge as railway station platform access

As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.

Deel op:

Projectdetails

Oplossing
Fiber Reinforced Bridges
Type
JFB
Lengte
9m
Breedte
2m
Gewicht
3000 kg
Belasting
Eurocode LM4
Materiaal brug
Fibre-reinforced polymere
Slijtlaag
Epoxy resin, anti-slip