History: 2003: Connecting bridge Offshore platform Kizomba
The client required a connecting bridge and a work pontoon on the Caland Canal to complete an offshore platform.
Janson Bridging installed a Heavy Girder bridge, hinged to the work pontoon on the waterside and slid onto the bank on the landside.
The bridge had a length of 38 meters and a driving width of 6 meters.
Einzelheiten zum Projekt
Lösungen
Paneel-Brücke
Typ
JPB-T
Gesamtlänge
38,1 meter
Deckbreite
5,7 meter
Gewicht
118 ton
Auslegungslast
Vehicle 50 tons
Installationsdatum
January 2003
Datum der Demontage
November 2003