The bridge on the Nije Dyk near Uitwellingerga was closed to all car and agricultural traffic on November 27, 2024. Only pedestrians and cyclists were allowed to cross. The 90-year-old bridge was in very poor condition and repair was no longer possible.

Janson Bridging was commissioned by the client to install a temporary bicycle bridge over the removed movable section, allowing cyclists and pedestrians to use the bridge again. We deployed our 15-meter JPB-P for this, equipped with a ramp on both sides. The bridge was delivered in one piece and hoisted into place and assembled on July 25.

Teilen auf:

Einzelheiten zum Projekt

Lösungen
Fußgängerbrücke
Typ
JPB-P
Montagedauer
1 day
Gesamtlänge der Brücke
15,2 m
Deckbreite
3 m