History: Highway bridge Waalwijk (NL)
Replacement of the A59 bridge over the Drongelens Canal
After 60 years, the bridge over the Drongelens Canal near Waalwijk was due for replacement. Over the years, the (heavier) traffic on the A59 increased considerably. A new bridge was necessary to guarantee safety and traffic flow in the future.
During the work (2015–2016), the A59 remained accessible thanks to a temporary bridge construction next to the existing bridge. A fine example of infrastructure planning and collaboration.
#infrastructure #JansonBridging #A59 #mobility
Einzelheiten zum Projekt
Lösungen
Plattenträgerbrücke
Typ
JSB
Gesamtlänge
66 + 33 mtr
Straßenbreite
2 x 7,5 mtr
Gewicht
730 tons
Fahrzeuge und Fußgänger
Half step barrier system H2W1
Montagedauer
5 days
Auslegungslast
LM1 and LM2 (NEN-EN 1991-2) CC3
