JSB bridge in Szczawa

For the duration of the reconstruction of the bridge over the Kamienica stream along DW968 in Szczawa in Lesser Poland, we made available and installed, in cooperation with the client - Nowak Mosty - a single-span temporary JSB bridge with a length of 40.5 m and a deck width of 5 m. The bridge is intended to handle class B vehicle traffic and pedestrian traffic on a sidewalk separated from the deck.

Teilen auf:

Einzelheiten zum Projekt

Lösungen
Plattenträgerbrücke
Typ
JSB
Länge
40,5m
Breite
3,5m+1,5m
Gewicht
109t.
Kapazität
kl.B
Plattenträgerbrücke