JFB bridge as railway station platform access

As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.

Teilen auf:

Einzelheiten zum Projekt

Lösungen
Fiber Reinforced Bridges
Typ
JFB
Länge
9m
Breite
2m
Gewicht
3000 kg
Tragkraft
Eurocode LM4
Brückenmaterial
Fibre-reinforced polymere
Deckbelag
Epoxy resin, anti-slip
Fiber Reinforced Bridges