Kristiansand access bridge

In order to enable the construction of a pipeline tunnel, but also to ensure the accessibility of several offices, a temporary bridge over the sheet pile wall pit was necessary. Our customer TT Anlegg chose the bridge system JSB-2 because this system could be installed quickly and because this bridge only needs to be put into use for 6 months.

The installation date was planned for April 26, 2022 and went without any problems in close cooperation with the customer.

Teilen auf:

Einzelheiten zum Projekt

Lösungen
Plattenträgerbrücke
Typ
JSB
Gesamtlänge
27 m
Länge der Elemente
13,5 m
Straßenbreite
5 m
Deckhöhe
1,1 m
Deckbelag
Anti skid 2/3 mm
Gewicht
69 tons
Auslegungslast
Loadcase 4-6, Bk 10/60 boggilast
Kunde
TT Anlegg
Plattenträgerbrücke